Flamanville 3 EPR nuclear new build - Regulatory conformity assessment
Project coordinator for the technical documentation review during conformity assessment of the RCS and NSSS assemblies: - coordination of the regulatory document review (drawings, calculation notes, welding files, non-destructive testing procedures, operational procedures…) according to RCC-M, EN standards and French regulation on nuclear pressure equipment with a pool of specialist engineers - interface with the nuclear safety authority and the manufacturer for project follow-up, management of non-conformances, discussion of technical and regulatory issues Project manager for the evaluation of the technical qualification of high integrity components for MSSS and MFWS lines: - preparation of inspection plan and technical evaluation guidelines for the inspectors - coordination of the inspections according to RCC-M, EN standards and French regulation on nuclear pressure equipment with inspectors and specialist engineers in Europe - interface with the nuclear safety authority, the manufacturer and its suppliers for project follow-up and management of non-conformances