Felix Gorovodsky, MSIT MBA
Server Room Clean-up
Re-Wiring the Patch Panels to Switches and re-running Fiber between the Switches to Cleaning out the Server Rack and moving APC from the ground to the Rack.
自己紹介などの詳しいプロフィールは、つながりをリクエストして承認されると表示できます。
Re-Wiring the Patch Panels to Switches and re-running Fiber between the Switches to Cleaning out the Server Rack and moving APC from the ground to the Rack.